Table of Contents

    SOLIDWORKS Pre-Requisites: 10 Things to Do Before Upgrading to SOLIDWORKS 2026

    solidworks-2026-install-blog

    Written by: Terry O'Reilly

    Published: Dec 8, 2025
    | View All Blogs

    Table of Contents

      Make sure your system meets the pre-requisite criteria for installing SOLIDWORKS with these 10 things to do before upgrading to SOLIDWORKS 2026.

      Packed full of great new features, SOLIDWORKS 2026 is now available to download and install.

      However, before you click ‘download’, it is a good idea to take some time to do a bit of a system health check and make sure you’re ready for SOLIDWORKS 2026.

      #1 – Check the System Requirements

      01 System Reqs
      You should always consult the SOLIDWORKS official System Requirements and End of Life pages prior to any upgrade.

      As software advances, we find that it moves beyond the capabilities of older, auxiliary software. As such, it’s important to note that SOLIDWORKS 2026 no longer supports:

      • Windows Server 2019
      • Microsoft Excel/Word 2016/2019
      • SQL Server 2017

      Whether or not you are affected by the above changes, it’s worth giving our Hardware team a call to make sure your system checks out, and that you are using a system that works for you.

      While it is certainly not a necessity, you may wish to use this as an opportunity to review your PC hardware, especially as it starts to show signs of age or decreased performance.

      Consider whether you could boost your productivity with our range of certified, professional Dell laptops and desktop CAD workstations, delivered to your door in as little as 48 hours!

      #2 – Plan Time for your Upgrade

      A blue gantt chart with upcoming milestones and activities.

      As with any major software update, you must consider the time required to upgrade and plan accordingly.

      We would certainly not suggest upgrading the software midway through a major project or with deadlines looming. While the installation shouldn’t take long, it’s worthwhile planning time out of your main working hours to minimise disruption.

      Consider whether your company operates over multiple sites, as you would want to schedule the upgrade to happen in a way that has the entire team update at the same time.

      If you are running a floating/network license, you also need to update the SolidNetWork License Manager (SNL), and reactivate it so that the client machines can retrieve a license. This is available via the download by running the “Server Products” option on the first screen.

      You should also consider who you work with, e.g. your suppliers and customers.

      With an active subscription, SOLIDWORKS 2026 files can be opened in a fully editable format by older versions up to two years prior (so SOLIDWORKS 2024 and 2025), to aid collaboration on any projects you have with external parties.

      It’s also good to include a bit of a buffer, so that if you do run into any problems during installation, then our Technical Support team can get you up and running again quickly and keep you on schedule.

      #3 – Check your IT Permissions

      A silver padlock lying on top of a yellow and green PCB.
      We would always recommend the installation to be done whilst logged in as a local or domain level administrator. A user with admin rights may not be sufficient.

      The program normally asks for a reboot on completion, so do ensure after the reboot you log back in as the same user (admin) that conducted the initial installation for the process to fully complete.

      #4 – Double check if you are using SOLIDWORKS PDM

      A set of blue box files with one red file selected.

      The process for upgrading SOLIDWORKS when also using SOLIDWORKS PDM is a little different.

      We strongly recommend contacting our PDM consultants via the Technical Support desk before proceeding with any upgrades.

      If you aren’t using SOLIDWORKS PDM, then consider utilising the SOLIDWORKS Cloud Services to manage your CAD data instead via the 3DEXPERIENCE platform and continue with your installation!

      #5 – Deactivate Previous SOLIDWORKS Versions

      This is good practise for any piece of software when available.

      If you have any previous versions of SOLIDWORKS installed, then be sure to open up SOLIDWORKS and deactivate your licenses before downloading SOLIDWORKS 2026.

      This applies to all types of SOLIDWORKS installations, whether they are Standalone, Network, or Admin Images.

      How to Deactivate Standalone SOLIDWORKS Licenses

      1. Open SOLIDWORKS
      2. Go to Help > Licenses > Deactivate…
      3. Click ‘Select All’
      4. Click ‘Next’ to deactivate the selected SOLIDWORKS licenses.
      The SOLIDWORKS help menu is expanded with the deactivation button highlighted by an orange box.

      For help deactivating network licenses or admin image installations, please contact our Technical Support team.

      #6 – Activate your 3DEXPERIENCE Platform

      A finger taps on the return key of a laptop to log in to the 3DEXPERIENCE platform.

      New licenses of SOLIDWORKS 2026 come with the SOLIDWORKS Cloud Services.

      To begin using the built-in data management system and collaborative tools and that come with these, make sure you activate your 3DEXPERIENCE platform.

      Click the link in your activation email to activate the platform and get started by following our free starter guides to the SOLIDWORKS Cloud Services here.

      If you have a SOLIDWORKS Subscription, but haven’t yet got around to upgrading your existing licenses to include the SOLIDWORKS Cloud Services, then get in touch with your Solid Solutions Account Manager.

      #7 – Organise your SOLIDWORKS Folders

      A blue, digital folder structure.
      It’s time for some spring cleaning!

      At this point while you are SOLIDWORKS ‘naked’, it’s a great time to do a few bits of admin.

      Ensure that your SOLIDWORKS installation files are stored in an accessible location. When it comes to installing the latest version, it’s sensible to amend the SOLIDWORKS Corp and SOLIDWORKS Data folders with the suffix ‘2026’ added.

      Don’t worry, our SOLIDWORKS installation guide covers everything you need to know about the actual installation.

      You should also double check that your template files are stored outside of the SOLIDWORKS Corp, Program Files, ProgramData, and SOLIDWORKS Data folders. These are all folders that could be removed during an upgrade, should you decide to do a clean installation of SOLIDWORKS 2026.

      When working with multiple users it is good practise to store template files in a shared folder, such as a SOLIDWORKS PDM vault.

      #8 – Make Backups of Key Files

      A row of four floppy disks. The third is being picked up by a human hand.
      We always recommend to all of our customers that they should be keeping regular backups of their key files.

      This will include standard templates, toolbox databases, and the output data from SOLIDWORKS (parts, assemblies and drawings).

      For those using Product Data Management (PDM) Systems and other database driven systems like SOLIDWORKS Electrical, we strongly encourage customers employ backup schemes of the archive and databases as the software will not do this automatically for you.

      Some files (such as toolbox) will be upgraded with the new version install, and this process is not reversible, so it is imperative you have a backup copy just in case.

      You should take care to backup any key data related to SOLIDWORKS, this includes the actual CAD files, templates and standard documentation, shared data such as SOLIDWORKS Toolbox, and any databases associated with programs such as PDM or SOLIDWORKS Electrical.

      #9 – Update Microsoft Office to 2021 or above

      Software updates and installation are represented in the foreground by a set of digital gears surrounded by cyclical arrows while a suited business person stands behind.

      As mentioned in the first item in this list, SOLIDWORKS 2026 does not support Microsoft Office 2019 or older.

      That means if you want to maximise your SOLIDWORKS productivity and prevent any issues further down the line, you should update your Microsoft Office products to 2021 or above before installing SOLIDWORKS 2026.

      Microsoft Office is used to drive design tables, sustainability reports, and loads more functionality within SOLIDWORKS.

      #10 – Pencil in your Subsequent Service Pack Updates

      Red pin marks the first day of a calendar.
      Every major SOLIDWORKS version sees 5 scheduled updates throughout the year called Service Packs. These provide performance enhancements as new technology becomes available, and roll out updates under the hood to improve your experience as a SOLIDWORKS user.

      It may feel a little early to think about another SOLIDWORKS update before you’ve even installed this one… but at least being aware of the update schedule is helpful for now.

      Based on historical releases, we expect the following Service Pack updates:

      • SP01: January 2026
      • SP02: March 2026
      • SP03: May 2026
      • SP04: August 2026
      • SP05: November 2026 – Overlaps with release of SOLIDWORKS 2027

      As SOLIDWORKS is continually developed during the year, these dates are subject to change at any point.

      Do consider pencilling in some time during those months to update your SOLIDWORKS again.

      While comprehensive, this list is certainly not exhaustive. If you have any further questions, then do check out our answers to frequently asked questions below to answer any queries you may have. If you are a user of SOLIDWORKS Electrical and PDM, then we recommend reading the SQL-related FAQs in particular.

      If you have a question that isn’t on the list below, then please contact our Technical Support team by emailing them via help@timech.com or call us on 01926 333 777.

      Get a SOLIDWORKS Quote

      Interested in SOLIDWORKS? Contact us for questions, trials, or demos by clicking the button below or call 01926 333777. Our experts will help you find the perfect solution.

      proteus-exploded-view-dramatic-alpha-solidworks-visualize-overlay

      Related Posts

      How to Find Reaction Forces in SOLIDWORKS Simulation

      SOLIDWORKS helps us to find resultant forces through simulation studies. These virtual tests reduce the need for physical prototypes and give us an accurate answer.

      Setting number of decimal places in a table on a drawing

      When creating an equation in a drawing general table, is it possible to define the…

      SOLIDWORKS Smart Fasteners

      SOLIDWORKS Smart Fasteners is a really useful time saving tool, allowing you to automatically insert toolbox fasteners such as bolts and screws into an assembly providing there is a standard hole.

      Why is my Flat Pattern not showing in SOLIDWORKS Drawings?

      This may be linked to how the drawing is saved or it can be related to how sheet metal parts are displayed in drawings, read on to find out how to fix it.

      Why is SOLIDWORKS Crashing?

      It’s one of the great mysteries of life – why is SOLIDWORKS crashing? Let’s explore how SOLIDWORKS crashes and how we can improve performance in SOLIDWORKS.

      SOLIDWORKS Tips: Are you Making this Common Mistake in Fatigue Analysis?

      Simulation is a vital and complex engineering need. Fortunately, SOLIDWORKS makes it easy to test, correct mistakes and obtain accurate results.

      Tech Support Blog: Why are my SOLIDWORKS BOM Quantities Wrong?

      Why are my SOLIDWORKS BOM Quantities Wrong? A support call cropped up this week which…

      Series 1 Land Rover Pedal Car – Made Easy with Solidworks!

      The Series1 began production in 1948 designed to help get Britain farming after the war effort. It grew extremely popular and today enthusiasts are prepared to throw their life savings at restoring originals from that period.

      How to Get Your Serial Number for SOLIDWORKS Visualize Standard

      Want to download Visualize to make photorealistic renders? Follow this guide for accessing your Visualize serial number that comes bundled in with SolidWorks Professional and Premium.

      How to Recover SOLIDWORKS Files After a Crash

      SOLIDWORKS has two different methods to help you recover from an unexpected crash or loss of data in the form of auto-recovery and back-up settings.