Does Your Company Really Need a Full-Time SOLIDWORKS PDM Administrator?

Written by: Wayne Marshall
Published: Nov 20, 2026
| View All Blogs
One of the misconceptions we often hear about SOLIDWORKS PDM is that implementing it means somebody will need to become a full-time PDM administrator.
For most organisations, that simply isn’t the case.
PDM does need ownership, and someone needs sufficient knowledge and authority to manage users, respond to questions and make controlled changes to the system. But once a vault has been properly implemented and users are familiar with it, administration is normally a combination of occasional reactive tasks and planned proactive improvements, rather than a full-time occupation.
So, what does a SOLIDWORKS PDM Administrator do?
Day-to-day SOLIDWORKS PDM Administration
Day to day SOLIDWORKS PDM Administration is usually quite light, and perhaps the most common administrative activity is managing users, which is unlikely to be something you are doing very often.
When somebody new joins the Engineering team, for example, the SOLIDWORKS PDM Administrator might need to:
- Add or import the new user into the vault.
- Add them to the appropriate PDM groups.
- Check that those groups give them the correct folder, file and workflow permissions.
- Install the PDM Client and assign the appropriate PDM licence type (if required).
- For a Desktop User, ensure they have a local vault view and can successfully connect.
- For a PDM PRO Web User that they have the required URL bookmarked
- Provide some basic onboarding or arrange formal PDM user training.
Let’s break this down. Where possible, access should be controlled through groups rather than lots of individual user settings. This makes onboarding considerably simpler and makes it easier to change someone’s access when their job role changes. An Implementation from Solid Solutions comes with Role (Group) based permissions already defined and ready to go.
Offboarding is equally important. When somebody leaves, their PDM account and access should be reviewed and disabled as part of the company’s normal leaver process. Deleting a User doesn’t delete the History of their activity or impact the auditability of any file. A Deleted User will show in History with (Deleted YYYY-MM-DD) after their name and can be restored later if that is ever required.
None of this normally occupies somebody every day. In many businesses, these activities happen only when a new Team member joins, or something changes in an existing Team members role.
Based on the scale and size of your deployment, other occasional tasks could include…
Upfront tasks
- Work with IT to define / document / test your “Disaster Recovery” Plan for SOLIDWORKS PDM
- Define a retention policy for Deleted Items in Vault.
- Define a Change Request / Review / Test / Implementation Process for Vault modifications
Optional Upfront tasks
- Creation of a ‘Sandbox’ vault to support the change request / review process (test environment)
- Define and document baseline performance parameters (create a Benchmark)
- Define and implement your internal ‘Support’ process including an escalation procedure for passing queries to Solid Solutions.
Scheduled / Periodic Maintenance tasks
- Vault Health / User review. Create yourself a Search Favourite to list all Checked Out files so that you can prompt users to regularly Check files in. For PDM Pro you could also use a (SQL) Report to list files checked out longer than a specified number of days.
- Managing abandoned files: If a user leaves a company, goes on an extended leave, or a machine crashes, an administrator can use Undo Check Out (which discards local changes) or utilize the Transfer Ownership feature (introduced in SOLIDWORKS PDM 2026) to reassign and check in the files.
Based on your Retention Policy review Deleted Items per Project / Vault and ‘Destroy’ as appropriate NOTE: If you do not regularly destroy the deleted items in the Vault then you may find that after Destroying many items (and the process has completed) that you will need to Shrink and Rebuild Indexes to remove the fragmentation resulting from that mass removal of data from the database.
- Following a Major Version upgrade or any changes to IT infrastructure, you may want to review Vault performance against your benchmark and previous tests
- Coordinate / deliver the annual upgrade of SolidWorks / SolidWorks PDM with / without support from Solid Solutions.
- For Customers using PDM Professional with Web 2.0, clear the cache for the Vault View on the Web Server
- Once a year ‘Reactivate’ the License Manager to avoid license expiry warning.
Reactive PDM Administration: When something doesn’t behave as desired or expected
Some Administration is inevitably reactive. A user might report that they:
- Cannot see a particular folder
- Cannot perform a workflow transition
- Are not receiving an expected notification
- Cannot check out / change a file
- Cannot find information they expect to see
- Are having problems with an automation task such as PDF generation
- Need access to an area of the vault they haven’t previously used.
The Administrator’s role in these cases is often to establish whether this is a fault or simply the result of the vault doing what it has been configured to do.
For example, a user being unable to Approve a document could be by design (We typically do not allow “Sequential State Changes” to block self-approval). Being unable to see a specific folder could be an expected restriction in that Group. And a file that cannot be transitioned may be a result of missing (mandatory) metadata as per the warning that will display in the Transition dialog box.
These are generally internal support events, rather than daily administration.
And, importantly, the SOLIDWORKS PDM Administrator does not have to solve every problem alone. Once you have determined if the reported issue is ‘by design’ or possibly tied to a Software or Infrastructure fault, those more complex software issues should be escalated to the organisation’s IT team or to Solid Solutions’ support team.
Proactive PDM Administration: Preventative Maintenance and Continual Improvement
The more valuable part of PDM Administration is often not fixing things at all… It’s extending or making the solution more efficient as requirements Change or new features are introduced in new releases.
PDM shouldn’t necessarily remain exactly as it was on the day it was implemented. Businesses change, processes develop and requirements appear that weren’t considered during the original implementation.
A good PDM owner might periodically review:
- Whether workflows still represent the real approval process
- Whether redundant users or groups can be removed
- Whether group / user permissions remain appropriate
- Whether Data Cards are capturing the right information
- Whether custom searches and/or improved column views could make information easier to find
- Whether repetitive activities could be automated using standard or bespoke functionality
- Whether notifications are still appropriate and the content of them effective
- Whether new document types or departments could benefit from being managed in PDM
- Whether existing tasks, add-ins and integrations are operating as intended.
This is where administration moves beyond simply maintaining SOLIDWORKS PDM and starts to deliver additional value from the investment.
Beyond the Vault: Why Your PDM Deployment Deserves a Second Look
Taking advantage of Enhancement within new releases
There is another proactive task that’s easily overlooked: finding out what has changed and where appropriate, incorporating those changes into your Vault.
SOLIDWORKS PDM continues to develop. The 2027 release, for example, introduces enhancements to the log in process for PDM PRO users wishing to incorporate SSO with cloud providers, the ability to manage how ‘Tasks’ are distributed, better management of Replication schemas and the ability to use custom column sets in Web2,0 too.
The Best of the Rest: Hidden New Features You May Have Missed from SOLIDWORKS PDM 2020-2025
A SOLIDWORKS PDM Administrator doesn’t necessarily need to implement every new feature. They should, however, periodically review the What’s New information and ask:
Would any of this make life easier for our users or administrators?
Solid Solutions produce dedicated What’s New videos and Blogs each year for PDM and Manage. We also offer services where we can manage all this for you. Our Continual Improvement Service allows us to collaborate with you to understand your Business and the use of PDM so that we can recommend and also introduce the new features most appropriate to ensuing your organisation gets the most from the new release.
That turns an annual software upgrade into an opportunity to improve the system rather than simply installing a later version of the same software.
What about the Servers, SQL and backups?
This is an important distinction because PDM administration and IT administration are not the same job.
A PDM administrator might understand the PDM architecture and help coordinate maintenance, but responsibility for the underlying infrastructure will commonly sit with IT.
Typical IT responsibilities for an ‘On Premises’ or self-provisioned ‘Cloud hosted’ deployment include:
- Windows Server maintenance and patching
- SQL Server maintenance
- Server monitoring including RAM usage and available disk capacity
- Network connectivity, DNS and Server name resolution
- Firewall and security policies
- Backup infrastructure and monitoring
- Disaster Recovery procedures
- Antivirus and endpoint security exclusions/configuration;
- Service accounts (e.g. for SQL Server or Web2.0) and Windows permissions.
The SOLIDWORKS PDM Administrator and IT team should work together, particularly around upgrades, backups and infrastructure changes, but that doesn’t mean your CAD or PDM administrator suddenly needs to become the company’s SQL Server and Windows Server administrator.
And some activities are projects rather than routine housekeeping. Annual upgrades are relatively straight forward and often carried out in house, but by outsourcing to Solid Solutions you know that our team will be able to provide expert advice (when an automated Client roll out may be more appropriate that standalone installations and how to make that switch, for example), minimize risks (off site testing Database upgrade process) and downtime to ensure you can focus on the day to day job. We can also offer a ‘What’s New in SOLIDWORKS’ session to the team whilst that upgrade is taking place.
So how much administration does SOLIDWORKS PDM really need?
There isn’t a single number that applies to every company.
A five-user engineering department with PDM Standard and one straightforward workflow clearly has different requirements from a multinational organisation with hundreds of users, multiple sites, replication, numerous workflows and extensive automation, but… SOLIDWORKS PDM (especially PDM Professional) being a sophisticated system doesn’t automatically make PDM Administration a full-time job.
For many organisations, a better model is to identify one or more internal PDM Administrators who have been properly trained and are given sufficient time to look after the system when required.
Their job isn’t to spend every day administering PDM. It’s to own the system.
That means dealing with the small administrative changes that inevitably occur, helping users when necessary, working with IT on infrastructure-related activities and, perhaps most importantly, periodically looking for ways PDM can better support the business.
A well-managed PDM system shouldn’t create a permanent administrative burden. It should reduce one.
If you have taken an Implementation Service (FASTSTART plus ASSIST or FOUNDATION) from Solid Solutions, then it is likely you had a Training Credit for the classroom Administration Training course. Please make sure that you do not let this credit go to waste!
Alternatively, if you have a large / complex deployment and you need help getting the system under control / optimized etc, then why not talk to us about our Continual Improvement Service, or even our ‘Virtual’ PDM Administrator where we can deliver all the Administration tasks, including reviewing the setup for optimisation opportunities as a virtual member of your team.
Categorised as: Data Management | SOLIDWORKS PDM
Get Expert SOLIDWORKS Training
Get hands-on SOLIDWORKS training in-person or online, led by certified experts with real industry experience. With venues across the UK & Ireland, it’s easy to start learning today.
Related Posts
How to Create a Pack and Go in SOLIDWORKS
Pack and Go in SOLIDWORKS should be used when sending SOLIDWORKS files to another person. Use this simple guide to help you safely send entire SOLIDWORKS projects.
What is 3DSWYM? A 3DEXPERIENCE Platform Tutorial
3DSwym is the application at the heart of the 3DEXPERIENCE, allowing users to connect and collaborate across the platform.
Microsoft SQL Server licensing for SOLIDWORKS PDM
October 2020 marks two important milestones for the SOLIDWORKS PDM family and SQL Server.
Part Numbering in SOLIDWORKS PDM Professional
When implementing a new PDM Professional Vault Customers will have the option to review their part numbering and classification requirements as they move to a system that allows them to, in most cases, automate the way the identify ‘parts’ within the Vault. Part Numbering is something that a lot of customers approach differently and this is often based on ‘how it’s always been done’ without necessarily considering what is the purpose of a Part Number within their organisations and wider within their supply chains. If we consider the humble part number. What is it’s purpose?
The 6 Golden Rules of Managing Data in SOLIDWORKS
When modelling in SOLIDWORKS, before you know it, you will have created lots of parts, assembly and drawing files, so it’s important to think about how you will manage these files and keep everything organised. Here we discuss the ‘6 Golden Rules’ of managing your SOLIDWORKS files using Windows Explorer and recommended methods for file naming, structuring your projects and managing revisions.
This kicks off a month looking at the management of CAD data, register for one of our upcoming live webinars at the bottom of this article.
PDM Professional – Assigning Users with Conditional Notifications
Often customers will create smaller project teams for specific jobs and in the past we have been asked if it is possible, within a multi stage workflow, to pre-assign at the creation stage users who will be notified as checker / approver within those transitions. This blog will demonstrate how, using conditional Notifications in PDM Professional, this can be configured. We will also create some logic to allow for certain parts of the workflow to be bypassed by validating the selected ‘names’ against transition conditions. In this example the ‘approvers’ will be assigned on the files DataCard, but it would be just as feasible to have these names inherited from a project folder card if defining the rules at a higher level was possible within your Teams.
Managing Disk Space with SOLIDWORKS PDM Part #1: Distributing the Archive
This blog series was prompted by a recent support ticket, logged when a customer found their PDM Professional installation suddenly became unusable. The warning message, led to my reviewing the Archive Server Log file and this quickly identified the problem being a result of the PDM Server running out of disk space.
Managing Disk Space with SOLIDWORKS PDM Part #2: Deleted vs Destroyed and the Vault Cleaner Service
In this blog series we are examining the factors influencing disk usage within PDM and what you can do to manage them. In the first part we discussed how you can re-organise your archive across multiple drives to get you back up and running quickly should you find you are short on space. This blog and the next part will discuss behaviours in PDM that can result in redundant disk usage and how you can free that up with the vault cleaner service.
Managing Disk Space with SOLIDWORKS PDM Part #4: Cold Storage
In this blog series we are examining the factors influencing disk usage within PDM and what you can do to manage them. In the first part we discussed how you can re-organise your Archive across multiple drives to get you back up and running quickly should you find you are short on space. In the second part we looked at the differences between a deleted and a destroyed file and the impact the PDM recycle bin has on Disk usage. Part three discussed temporary session files created by the PDM Web Server and this Part will look at an option within PDM called Cold Storage.
Managing Disk Space with SOLIDWORKS PDM Part #5: Archive Compression
In this blog series we are examining the factors influencing disk usage within PDM and what you can do to manage them. In the first part we discussed how you can re-organise your archive across multiple drives to get you back up and running quickly should you find you are short on space. In the second part we looked at the differences between a deleted and a destroyed file and the impact the PDM recycle bin has on Disk usage. Part three discussed temporary session files created by the PDM Web Server. In part four we discussed cold storage and in this last part we will look at archive compression.